Key takeaways
- ✓The council is now City of Moreton Bay, but the scheme is still the MBRC Planning Scheme 2016 — currently version 7.1.
- ✓Council publishes the scheme as an eScheme viewer, with separate planning scheme maps and My Property Look Up for address checks.
- ✓Development approval and building approval are separate. A private certifier usually handles the second.
- ✓Coastal hazard, flood and environmental areas overlays do the heavy lifting across the bayside and the western rural half.
- ✓Parts of Caboolture West and Petrie sit in State-declared Priority Development Areas, where the council scheme is not the assessment instrument.
Do You Need Council Approval in Moreton Bay?
You'll usually hear this called a development application, or DA — that's the formal name for council approval under the Planning Act 2016. In Moreton Bay, the council is City of Moreton Bay, and the rules it applies still sit in a scheme carrying the old name: the MBRC Planning Scheme 2016.
That naming gap trips people up. The council renamed itself City of Moreton Bay, but the planning instrument was not renamed with it, and Council's own pages still refer to the MBRC Planning Scheme. Searching for a "City of Moreton Bay planning scheme" will not find the document you need.
Get a council-ready planning report in 5 minutes — no planner, no waiting.
Get your report →The short answer
In Moreton Bay, you need a development application when the MBRC Planning Scheme 2016 makes the work assessable for your zone and overlays. Much minor domestic work is accepted development. Building approval is a separate approval, usually issued by a private certifier rather than Council.
Figure 1: Two tracks run in parallel. One does not answer the other.
The MBRC Planning Scheme 2016
The scheme commenced on 1 February 2016. The current version is version 7.1, which commenced on 23 June 2025 through Administrative Amendment No. 3 — made to account for migrating the scheme into Council's new online viewer, with no change to the policy content of version 7.
Version 7 is the substantive one to know about. It commenced on 30 October 2024 and carried Major Amendment No. 3, the Better Housing Amendment, which reworked a good deal of the residential provisions. If you are working from advice written before late 2024, assume it is out of date on housing. Council has also publicly corrected an anomaly in the dwelling house code setback table that arose during the migration — a reminder to read the live eScheme, not an old saved PDF.
Like every Queensland scheme, this one follows the QPP structure — a strategic framework, zone codes, overlays and tables of assessment — with council-specific codes layered on top. Queensland schemes are far less standardised than people assume, so a rule learned in another council rarely transfers. How to find out what zone your property is in covers that structure generally.
Two approval tracks, not one
Spend 5 minutes, not 3 weeks
instantDA generates a council-ready planning report for Queensland development applications. No town planner. No waiting.
Get your report →Development approval is a Planning Act 2016 decision. Council is the assessment manager, and it deals with land use, siting, scale and compliance with the codes in the scheme.
Building approval is a Building Act decision about whether the structure complies with the building assessment provisions, usually issued by a private certifier. Different legislation, different decision-maker.
A patio can be accepted development and still need building approval, and holding a building approval does not cure the absence of a development approval where one was needed. Building approval versus development approval covers the distinction. Plumbing adds a third track through Council's plumbing team.
- ✓What is the zone?
- ✓Which overlays apply?
- ✓Is the work accepted, code assessable or impact assessable?
- ✓Is the site inside a Priority Development Area?
- ✓Do you also need building approval?
- ✓Is plumbing involved?
Checking your own address
Figure 2: Council's tools, and the overlays that bite locally.
Council publishes the scheme as an eScheme viewer, with the individual parts downloadable as PDFs from inside it. Separately it publishes planning scheme maps, readable as interactive maps or downloaded, and a My Property Look Up tool that pulls the scheme layers affecting a single address together in one place.
Start with My Property Look Up, then read the relevant overlay and zone codes in the eScheme. Council also runs a DA Tracker for following applications from lodgement to decision — worth checking to see what has been approved, and conditioned, nearby.
For State-administered layers the council scheme does not carry, cross-check the site on the Queensland Globe.
What catches Moreton Bay owners out
Coastal hazard. The bayside strip through Redcliffe, Scarborough, Deception Bay and the canal estates sits under coastal hazard mapping for storm tide inundation and erosion prone areas. The coastal hazard overlay is one of the few in this scheme with its own dedicated code and assessment tables, and it drives floor levels and sometimes the category of assessment. Storm tide and coastal hazard in Queensland explains these controls.
Koala habitat. The one most people get wrong. In South East Queensland, koala habitat areas and koala priority areas are mapped and regulated by the State under the Planning Regulation 2017 and the koala conservation plan — not by Council. Council's environmental areas overlay picks up matters of State and local environmental significance alongside it, but does not replace the State framework. Koala habitat rules in Queensland covers the interaction.
Priority Development Areas. Much of the growth story here is not assessed under the council scheme at all. The Waraba PDA at Caboolture West, declared in 2024 and covering roughly 2,880 hectares, and the Moreton Bay Central PDA around Petrie are State-declared areas administered by Economic Development Queensland. Inside a PDA, the PDA instrument governs. Land nearby is often in the Emerging community zone — see the Emerging community zone explained.
The rural west. Dayboro, Woodford and the hinterland bring bushfire and landslide hazard, scenic amenity, rural residential lot sizes and vegetation constraints into play. Start with vegetation management.
When you will probably need a DA
Work that changes the use of a property, adds a dwelling, subdivides, sits in a coastal hazard, flood or environmental areas overlay, or exceeds the thresholds in the applicable code, is likely to be assessable. Council's 2025-26 development services fee schedule lists a code assessable material change of use for residential uses in category 2 — which includes a dwelling house — at $2,252.00 per application, and code assessable building work assessed against the planning scheme for domestic uses at $985.00. Fees are reset annually.
Minor domestic work on an unconstrained lot is far more often accepted development, or accepted subject to requirements — a different thing, meaning acceptance conditional on meeting stated requirements.
What to do next
Run My Property Look Up for your address, list every overlay, confirm whether the site is inside a PDA, then read the table of assessment for what you intend to build.
If you'd rather see the zone, the overlays and the likely category of assessment for a Moreton Bay address pulled together in one place, an instantDA planning report does that for $169 — against the $800–$1,500 a town planner typically charges for a preliminary opinion. You can start a report in a few minutes.
Then confirm with Council before you commission drawings. For anything touching coastal hazard, environmental areas or a PDA boundary, have that conversation early. Council's planning scheme pages are at moretonbay.qld.gov.au.
Frequently asked questions
What is the planning scheme for City of Moreton Bay?
Do I need council approval for a shed or patio in Moreton Bay?
Does the council scheme apply at Caboolture West and Petrie?
Who regulates koala habitat in Moreton Bay?
How much is a development application in Moreton Bay?
Ready to generate your report?
Skip the writing. Get a council-ready planning report in 5 minutes.
Get your report