Reconfiguring a lot, minimum lot size, boundary realignments, and land-locking rules.
Moving a boundary between two lots in QLD is reconfiguring a lot and needs council approval. What's assessed, the survey
7 min read
What are infrastructure charges in QLD? How councils calculate them, when the notice arrives, the credit for existing us
7 min read
Can you split your block in QLD? The four tests that decide it — zone, minimum lot size, frontage and services — plus wh
7 min read
What a battle-axe block is, what Queensland planning schemes control about the access handle, and the checks to run befo
7 min read
The full QLD land subdivision process, stage by stage: the ROL application, operational works, the survey plan, plan sea
7 min read
Queensland has no state-wide minimum lot size for subdivision. Here is why, what else has to be met besides area, and ho
7 min read
What operational works approval means in Queensland, what work needs one, how it is assessed, and why it decides when yo
7 min read
Reconfiguring a lot is the QLD planning term for changing lot boundaries. What it covers, how it differs from an MCU, an
7 min read
What subdivision costs in QLD, stage by stage: application, consultant reports, infrastructure charges, civil works, sur
7 min read
What a survey plan is in QLD, the three registrable plan formats, who can certify one, plan sealing by council, and regi
7 min read